Extended Range Twin Engine Operations (ETOPS)
Duration: 00:45 hour
Exam: 20 Questions
Available: 90 days
DESCRIPTION
After completion of the Extended Range Twin Engine Operations (ETOPS)course the successful applicant should be familiar with ETOPS operations, equipment and procedures. This course also covers the training requirements for operators who have been granted a diversion time up to 180 minutes without a specific ETOPS approval. The training emphasizes the development of all required skills and complies with EASA requirements.
THEORETICAL KNOWLEDGE SUBJECTS
Brief overview of the history of ETOPS
ETOPS regulation
Definitions
Approved One-Engine-Inoperative Cruise Speed
ETOPS Type Design Approval
Maximum approved diversion times and time-limited systems capability
Operator’s Approved Diversion Time
Routes and aerodromes intended to be used in the ETOPS area of operations
ETOPS Operations Approval
ETOPS Area and Routes
ETOPS en-route alternates aerodromes including all available let-down aids
Navigation systems accuracy, limitations and operating procedures
Meteorological facilities and availability of information
In-flight monitoring procedures
Computerized Flight Plan
Orientation charts, including low level planning charts and flight progress chart usage (including position plotting)
Equal Time Point
Critical fuel
Flight planning and Dispatch
ETOPS Fuel requirements
Route Alternate selection - weather minimum
Minimum Equipment List – ETOPS specification
ETOPS service check and Tech log
Pre-flight FMS
Flight performance progress monitoring
Flight management, navigation and communication systems
Aeroplane system monitoring
Weather monitoring
In-flight fuel management to include independent cross checking of fuel quantity
Diversion Procedures and Diversion ‘decision making’
Degraded Meteorologial Conditions
Degraded Systems
Authority of the Commander
APPLICABILITY
Flight Crew
Dispatch


